Construction irregularities on real estate: The complete legal guide for buyers, sellers and property owners
How construction irregularities could cost you hundreds of thousands of shekels — and what you can do to protect yourself.
Table of Contents
1.opening:When the house you bought becomes a ticking time bomb
דמיינו את התרחיש הבא: רכשתם דירה בירושלים, שילמתם מחיר גבוה, חתמתם על חוזה, אולי אפילו עברתם לגור. ואז — דפיקה בדלת. פקחים מהרשות המקומית. צו הריסה לממ”ד שנבנה ללא היתר. תוספת בנייה לא חוקית שהמוכר “שכח” לציין. ולפתע מתברר שרכשתם בעצם נכס עם צלקת משפטית שעולה עשרות ואף מאות אלפי שקלים לטיפול.
This scenario is not hypothetical. It happens in Israel and Jerusalem. According to the Jerusalem Local Planning and Building Committee, thousands of enforcement cases are opened every year. A large portion of them concern properties that were sold to new owners without the irregularities being disclosed to the buyer.
This article is intended to give you — buyers, sellers, and property owners — all the legal information you need to protect yourself. We will discuss the definitions, types of exceptions, criminal and planning implications, the question of seller liability, and possible solutions — from the perspective of an experienced real estate lawyer in Jerusalem.
2. What is a construction exception?? Comprehensive legal definition
2.1 The definition according to law
חריגת בנייה היא כל עבודת בנייה שנעשתה ללא היתר בנייה כדין, בניגוד לתנאי ההיתר שניתן, או בחריגה מהוראות תוכנית בניין עיר (תב”ע) החלה על המגרש. הבסיס החוקי המרכזי הוא חוק התכנון והבנייה, תשכ”ה-1965, ובפרט סעיפים 145, 204 ו-212 לחוק.
חוק התכנון והבנייה, תשכ”ה-1965, סעיף 145: “לא יעשה אדם אחד מאלה ולא ייתן לאחר לעשותם אלא לאחר שנתקבל היתר לכך… הקמת בניין, הריסת בניין, כל תוספת לבניין קיים, כל שינוי בבניין קיים ועוד.”
2.2 What is considered a construction deviation in practice??
In practice, a building exception can range from a small warehouse built without a permit in a yard, to an entire floor added to a building. Its legal definition is broad enough to include:
- Construction without a permit at all — Including structures built decades before the permit application was submitted
- Construction in violation of the permit — Such as increasing the built-up area beyond what was approved
- Change of designation without approval — For example, converting a balcony into a living room
- Construction that exceeds building boundaries — Too close to the boundary of the field
- תוספות גג, סגירת מרפסות, ממ”דים לא מאושרים
עפ”ג 8731-04-09 מדינת ישראל נ’ ועדה מקומית לתכנון ובנייה שומרון — בית המשפט קבע כי הגדרת “עבודה טעונת היתר” בחוק התכנון והבנייה היא רחבה, וכל עבודה שיש בה כדי לשנות את מצב הנכס — חייבת בהיתר.
3. Types of construction irregularities common in Jerusalem and Israel
3.1 Illegal building additions
3.1.1 Closing balconies
One of the most common violations in Jerusalem is the closing of open balconies to living rooms. Many apartment owners close balconies over the years without obtaining a permit, increasing the area of the apartment in a way that is not reflected in the official registration. This situation creates a significant gap between the registration in the land registry and the actual property.
3.1.2 ממ”דים ומחסנים ללא היתר
ממ”דים (מרחב מוגן דירתי) הם חובה על פי חוק מאז שנות התשעים, אולם ממ”דים רבים נבנו ללא קבלת אישור תקני ובנייתם לוקה בחסר מבחינת מידות, עובי קירות, פתחים ואוורור. ממ”ד שאינו עומד בתקן אינו רק חריגת בנייה — הוא עלול לסכן את חיי הדיירים.
3.1.3 Rooftop and attic access rooms
בשכונות רבות בירושלים כגון קטמון, בקעה, תלפיות ורמת שרת, שכיחות ביותר חריגות של בנייה על הגג — חדרי יציאה, מרפסות גג, ואף קומות שלמות שנוספו ללא כל היתר. חריגות אלה נראות לעיתים כ”נורמה” בעיר הוותיקה, אך מבחינה משפטית — כל אחת מהן היא עבירה על חוק התכנון והבנייה.
3.2 Exceptions to use
3.2.1 Unlawful change of designation
Changing the use of a property from residential to commercial, from warehouse to apartment, from warehouse to office, etc. requires a rezoning process before the local planning and building committee. When this is done without approval, a use exception is created that can result in closure orders and even heavy fines.
3.2.2 Splitting apartments
In Jerusalem, the high rental market often leads to the illegal splitting of apartments. A 3-room apartment is turned into two separate units, each with its own entrance, without a permit. This constitutes both a construction and use exception.
3.3 Building line irregularities
3.3.1 Construction beyond the permitted limit
Building lines determine the minimum distance that must be maintained between the construction and the boundaries of the lot, the street, and neighboring buildings. Construction that exceeds these lines constitutes a building exception, even if a partial permit has been granted for it—since the permit itself may be invalid due to the exception.
Appeal 1044/0824 Rosh Ha'ayin— The Jerusalem District Planning and Building Appeals Committee revoked a permit issued in deviation from the front building line. It was determined that the building line is a cogent provision that cannot be deviated from without an appropriate procedure.
4. The criminal consequences of construction violations
4.1 Criminal offenses under the Planning and Building Law
חוק התכנון והבנייה, תשכ”ה-1965, קובע עבירות פליליות מפורשות בגין בנייה ללא היתר. סעיף 204 לחוק מגדיר את העבירות ואת העונשים הצפויים:
Section 252 of the Planning and Building Law: “העובר על הוראות סעיפים 145, 160 או 161, דינו מאסר שנה אחת או קנס… ואם העבירה נעשתה בכוונה למכור את הנכס, דינו מאסר שנתיים.”
4.1.1 Possible penalties
Anyone who builds without a permit may be charged with a criminal offense and face:
- Actual imprisonment — Up to two years in serious cases
- Significant financial fines — Determined by the value of the abnormal construction
- Judicial demolition order — requiring the demolition of the illegal construction at the defendant's expense
- Criminal record — which could harm your personal and professional future
4.2 Expanding criminal liability — Who is carrying it??
4.2.1 Responsibility of the builder and the client
The Planning and Building Law imposes criminal liability on both the person who carried out the construction (the contractor or craftsman) and the person who commissioned the construction (the property owner). In many cases, the property owner is unaware that he is building without a permit — but this does not exempt him from liability.
4.2.2 Liability of the purchaser who knew or should have known
גם רוכש נכס עם חריגות בנייה ידועות עלול להיחשף לאחריות פלילית — בייחוד אם הוא ממשיך להשתמש בחלק הבנוי שלא כדין, מבצע עבודות נוספות, או מוכר הלאה ללא גילוי. ידיעה בפועל, או “עצימת עיניים”, עלולות לבסס אחריות.
עפ”א 4004/98 — The Jerusalem District Court ruled that even a new owner of a property can be held criminally liable for construction violations that he continued to enjoy after he learned of their existence.
4.3 Statute of limitations and continuing offenses
4.3.1 Does a construction exception expire??
This is one of the most controversial legal questions. Ostensibly, the statute of limitations for criminal offenses is 5–7 years. However, Israeli case law has repeatedly ruled that the offense of building without a permit is “עבירה נמשכת” — As long as the illegal structure stands, the offense continues, and there is no statute of limitations.
Planning and Building Law, Section 212 — Authorizes the court to order the demolition of a structure built without a permit, even many years after its construction, and even without the filing of a criminal indictment.
בר”ע 3213/99 — The Supreme Court clarified that a construction violation is an ongoing offense that does not expire as long as the illegal situation actually exists. This determination has become one of the cornerstones of construction enforcement laws in Israel.
5. The planning implications — Demolition, orders and enforcement
5.1 Planning tools for enforcement
5.1.1 Administrative demolition order
The local authority (the Local Planning and Building Committee) is authorized to issue an administrative demolition order for unfinished construction — without a judicial process. The order requires immediate cessation of work and evacuation within 30 days, unless an appeal has been filed.
5.1.2 Judicial demolition order
After an indictment is filed, the criminal court is authorized to order the demolition of the illegal construction as part of the legal process. The court may also issue it as an independent order, even if the criminal proceedings have been closed.
5.1.3 Demolition notice under section 212
סמכות מיוחדת המאפשרת לרשות להוציא “הודעת הריסה” לבנייה ישנה שנבנתה ללא היתר — גם ללא הגשת כתב אישום וגם שנים רבות לאחר הבנייה. כלי אכיפה יעיל שמאפשר לרשות לפעול גם נגד בנייה עתיקת יומין.
5.2 The enforcement process in Jerusalem — Step by step
In Jerusalem, the local committee's building supervision department operates. Inspectors conduct regular patrols and also act on the basis of complaints from neighbors. Modern GIS systems are used to detect construction violations by comparing aerial photographs with registration data. The enforcement stages are:
- Inspector visit and recording findings
- Submitting a report to the local committee
- Issuing a notice to the property owner
- Filing an indictment in the Local Court
- Criminal trial, sentence, and demolition order
- Carrying out the demolition - if not carried out by the owner, by the authority at his expense
⚠️ Caution: The costs of carrying out the demolition by the authority — When the authority carries out the demolition itself, the costs of the work, including manpower, equipment, and waste removal, are borne by the property owner. These costs may reach tens of thousands of shekels or more.
5.3 Planning and Building Appeals Committee
5.3.1 The right of appeal and its deadlines
The decision of the Local Planning and Building Committee may be appealed to the District Appeals Committee within 30 days. In Jerusalem, the Jerusalem District Planning and Building Appeals Committee meets at the Jerusalem District Office of the Ministry of the Interior on Jaffa Street. Filing an appeal delays, in certain cases, the execution of the order.
עת”מ (ירושלים) 36444-10-19 — The Appeals Committee rejected an appeal filed against a demolition order, but determined that the property owners should be allowed a reasonable period of time to submit a request for qualification of the exception before the demolition is carried out. A period of 6 months was set.
6. Building lines — What they are and why they are critical?
6.1 Definition and legal validity
קו בניין הוא קו דמיוני הנקבע בתוכנית בניין עיר (תב”ע) ומגדיר את המרחק המינימלי שחייב להיות בין הבנייה לבין גבולות המגרש, הרחוב, ומבנים שכנים. חריגה מקו הבניין — בנייה קרוב יותר מהמותר — מהווה חריגת בנייה גם אם ניתן לבנייה היתר כולל.
6.2 Types of building lines
6.2.1 Front building line
The minimum distance from the front boundary of the lot (facing the street). In older Jerusalem neighborhoods such as Rehavia, Talbiya, and Baka, particularly strict front building lines are designed to preserve the street space and the character of the building.
6.2.2 Back building line
Minimum distance from the rear lot boundary. In single-family construction, this line is intended to ensure an open backyard and minimal privacy between neighbors.
6.2.3 The side building line
Minimum distance from the side boundaries of the lot. Single-family homes in Jerusalem must often maintain a distance of at least 3–5 meters from the side boundary.
6.3 Consequences of exceeding building limits
6.3.1 Permit cancellation
Violating building boundaries may result in the revocation of the permit for the entire property—not just the part that deviates. This is an extreme situation that can lead to a demolition order for the entire structure, even one that appears legitimate.
6.3.2 Neighbor disputes and tort claims
A building line encroachment often harms the neighbor next door. A neighbor who is injured is entitled to claim compensation for violation of privacy, obstruction of light and air, and a decrease in the value of his property.
ע”א 7368/06 דוד נ’ שמואל — בית המשפט המחוזי חייב בעל נכס לשלם לשכן פיצוי בסך 180,000 ש”ח בגין חריגת קו בניין שגרמה לחסימת אור ולפגיעה מהותית בנוחות המגורים.
7. Construction and property sale exceptions — Legal landmines
7.1 The seller's duty of disclosure
7.1.1 Increased disclosure obligation
על פי חוק המכר (דירות), תשל”ג-1973, וכן על פי עקרונות תום הלב החוזיים, מוכר נכס חייב לגלות לקונה כל פגם מהותי הידוע לו — לרבות חריגות בנייה. חובה זו מוגברת ביחס לעסקאות מקרקעין, שכן מדובר בנכסים בשווי עצום ובמידע שאינו נגיש לרוכש הממוצע.
חוק המכר, תשכ”ח-1968, Article 16: “מוכר שמסר לקונה מידע מטעה, או שנמנע ממסירת מידע שהיה עליו למסור — אחראי לכל נזק שנגרם לקונה עקב כך.”
7.1.2 What happens when an anomaly is discovered after purchase??
A purchaser who discovers a construction anomaly after signing the agreement is entitled to seek the following remedies, depending on the circumstances:
- Transaction cancellation — If it is a fundamental defect that the seller knew about and did not disclose
- Financial compensation — At the rate of training costs or asset depreciation
- Price reduction — “פיצוי חלקי” ביחס לשיעור הפגם
- Enforcing a contract with damages — If the buyer prefers to continue with the transaction
7.2 Due diligence before purchase
7.2.1 What to check before signing?
An experienced real estate lawyer will recommend performing the following checks before signing any property purchase contract in Jerusalem:
- Review of the latest taboo wording — checking liens, foreclosures, warning notes
- Review of the building file at the local committee — checking the permits issued and what was actually done
- Comparing the property diagram to the building permit
- Inspection at the Land Registry Office to locate demolition orders and prevent transactions
- בדיקת מצב תכנוני — תוכניות תב”ע החלות על המגרש
- A structural engineer's opinion regarding the physical condition of the property
7.2.2 Detection of anomalies by an engineer
In addition to the legal inspections, it is highly recommended to use the help of a certified building engineer who will inspect the property, compare the existing one to the approved plans, and detect any irregularities. The cost of the opinion — a few hundred to thousands of shekels — is tiny compared to the potential damage.
7.3 Problems obtaining a mortgage on properties with exceptions
7.3.1 Bank policy
Mortgage banks are required by the Bank of Israel to mortgage properties that are free of construction irregularities. A real estate appraiser on behalf of the bank will identify irregularities and reduce the value of the property — sometimes to the point of refusing to grant a mortgage. A buyer who has agreed on a high price may find himself without financing.
⚠️ Financing risk: An appraiser on behalf of the bank will deduct the cost of demolishing the deviation and the legal risk from the property's value. This deduction could amount to tens of percent — and prevent the property from receiving a mortgage in the required amount.
8. Seller's responsibility: Until the agreement is signed — or until registration in the land registry?
8.1 The central legal question
One of the most difficult practical questions in Israeli real estate law is: until when is the seller liable for discovered construction violations - is it only until the signing of the agreement, or even after the transfer of possession and until the property is registered in the buyer's name at the Land Registry?
8.2 The prevailing law — Detailed analysis
8.2.1 The position of the courts: Continuing responsibility
Israeli case law tends to determine that the seller's liability continues even after the agreement is signed, until the transaction is fully completed — that is, until the property is registered in the buyer's name in the land registry. This is so long as it concerns an exception that the seller knew about and did not disclose.
8.2.2 The legal logic behind the rule
A real estate transaction does not end with the signing of the agreement. It ends with the registration of the rights in the buyer's name. As long as the transaction is not completed, the parties are in a binding contractual relationship - and the seller must ensure that the condition that he conveyed to the buyer is maintained.
ע”א8068/11 עייני נ’ שיפריס — בית המשפט העליון פסק כי חובת המוכר לגלות חריגות בנייה אינה מוגבלת לשלב המו”מ ולחתימת ההסכם, אלא נמשכת לאורך כל שלבי ביצוע העסקה עד להשלמת הרישום.
8.2.3 What happens when the anomaly is discovered after registration??
Even after registration is complete, if it is proven that the seller knew about the deviation and did not disclose it, the buyer is entitled to a claim for damages for deception and non-disclosure, and sometimes even for breach of contract. The statute of limitations for such claims is 7 years.
8.3 Contractual protections — What should be included in the contract??
8.3.1 From the buyer's perspective
- The seller's declaration that the property is free of construction violations — or a full breakdown of any known violations
- Conditions precedent for conducting due diligence by an engineer and a lawyer
- An agreed compensation clause for defects discovered after delivery
- A mechanism for registering an immediate warning note in favor of the purchaser
8.3.2 From the seller's perspective
- Full disclosure of any known deviations — with supporting documentation
- Express limitation of liability for deviations discovered after the date of delivery
- A statement section stating that the purchaser has performed due diligence on its behalf.
- Releasing the seller from liability for changes made by the buyer after possession is transferred
9. Construction exception training procedures
9.1 What can be trained??
9.1.1 Planning training
לא כל חריגת בנייה ניתנת להכשרה. הכשרה אפשרית רק כאשר החריגה תואמת, או ניתנת להתאים, להוראות התב”ע החלה על המגרש. חריגה שאינה תואמת את התב”ע — למשל בנייה בשטח חקלאי — אינה ניתנת להכשרה כלל.
9.1.2 Submitting a permit application retrospectively
ההליך המרכזי להכשרת חריגה הוא הגשת בקשה להיתר בנייה בדיעבד לוועדה המקומית לתכנון ובנייה. הבקשה כוללת: תרשים הנכס כולל החריגה, חוות דעת אדריכלית ומהנדסית, הצהרת התאמה לתב”ע, תשלום אגרות ועלויות נלוות, וקבלת הסכמת שכנים במקרים מסוימים.
9.1.3 The process of approving a plan for a landfill
במקרים מורכבים, ניתן לנסות להכשיר באמצעות הגשת תוכנית “לגלגון” (תוכנית מפורטת מקומית) שתוכשר על ידי הוועדה המקומית ותאושר.
9.2 Training costs
9.2.1 Cost components
הכשרת חריגת בנייה כרוכה בעלויות ניכרות: שכר אדריכל ומהנדס, אגרות לוועדה המקומית, היטל השבחה, שכר טרחת עורך דין, ובדיקות וחוות דעת. בירושלים, עלויות הכשרה יכולות לנוע בין 50,000 ל-300,000 ש”ח ויותר, בהתאם לגודל החריגה ולמורכבות התכנונית.
9.2.2 Improvement levy — Hidden cost
The improvement levy is a payment to the local authority for an increase in the value of the property resulting from the construction permit. This cost, which is not always calculated in advance, can be very significant.
Planning and Construction Law, Section 196A: “חלה השבחה במקרקעין עקב אישור תוכנית, תשלום הבעלים היטל השבחה… בשיעור של מחצית ההשבחה.”
10. Relevant state ministries and how to contact them
10.1 Jerusalem Local Planning and Building Committee
10.1.1 Role and location
The Jerusalem Local Planning and Building Committee is the main licensing and enforcement body in the field of construction in Jerusalem. The committee is authorized to approve building permits, issue demolition orders, and conduct enforcement proceedings.
10.1.2 How to apply?
פנייה לוועדה המקומית אפשרית דרך מערכת פנייה מקוונת באתר עיריית ירושלים, בדוא”ל, או בהגעה פיזית ללשכת הרישוי. מומלץ להיעזר בעורך דין לניסוח הפנייה ולייצוג.
10.2 Land Registry Office (Tabu) Jerusalem
10.2.1 Role and services
לשכת רישום המקרקעין מנהלת את פנקס רישום הזכויות בנדל”ן: העברת זכויות, רישום משכנתאות, הערות אזהרה, עיקולים ועוד.
10.2.2 Checking demolition orders
You can check at the Taboo Office whether a specific property has a note regarding a demolition order, a transaction prevention order, or any other restriction. This check is an integral part of the due diligence before purchasing.
10.3 Jerusalem District Planning and Building Appeals Committee
The Appeals Committee is the body for appealing decisions of the local committee. It is possible to appeal the rejection of a permit application, the issuance of a demolition order, the setting of conditions on a permit, and more. The committee operates in the Jerusalem District of the Ministry of the Interior.
10.4 The relevant courts
10.4.1 Local Court
Offenses under the Planning and Building Law are heard in the Local Affairs Court — which is authorized to hear indictments, impose fines, and issue demolition orders.
10.4.2 Jerusalem District Court
Administrative petitions against the decisions of the Appeals Committee, as well as civil lawsuits for construction violations, are filed with the Jerusalem District Court.
10.5 רשות מקרקעי ישראל (רמ”י)
The Israel Land Authority manages the state's land — approximately 931,000 hectares of land in Israel. For properties built on managed land, a construction violation may violate the terms of the lease and even result in its termination.
11. Frequently Asked Questions and Answers
that: I purchased an apartment and discovered after handing over possession that it had a balcony enclosed without a permit. What do I do??
A: beginning, Contact a real estate lawyer to check the status of the file with the local committee - whether a demolition order has been issued against the property. again, Examine the agreement – did the seller declare that the property is free of any exceptions? If so, you may have a cause of action. Third, Check with an architect whether the exception is trainable.
that: Is it possible to sell an apartment with building exceptions??
A: Yes, you can — but the seller must explicitly disclose the deviations to the buyer. Selling without disclosure may constitute a criminal offense and expose the seller to serious civil lawsuits. Typically, a property with construction deviations will be priced lower.
that: I received a demolition order for a warehouse I built 20 years ago. Is it still valid??
ת: עבירת הבנייה ללא היתר היא “עבירה נמשכת” — אינה מתיישנת כל עוד המבנה עומד. עם זאת, ניתן לבחון האם קיים סיכוי להכשרה, להגיש ערר, או לנהל מו”מ עם הרשות. חשוב לפנות לעורך דין מקרקעין בהקדם.
that: האם ממ”ד שנבנה ללא תקן הוא חריגת בנייה?
ת: כן. ממ”ד שאינו עומד בדרישות התקן הישראלי (ת”י 4301) ושלא קיבל אישור מפקד פיקוד העורף הוא חריגת בנייה. בנוסף, הוא עלול להיות מסוכן לשעת חירום. יש לבצע בדיקת תקינות על ידי מהנדס מוסמך.
that: How long does the construction exception preparation process take??
ת: הליך הכשרה שגרתי לוקח בין 6 חודשים לשנתיים, תלוי במורכבות החריגה ועומס הוועדה. הליכים מורכבים הכרוכים בשינוי תב”ע עשויים לקחת שנים.
that: Can a lawyer stop a demolition order??
A: Yes, under certain circumstances. A lawyer can file an appeal with the Appeals Committee, request a stay of execution, or file an administrative petition with the court. Success depends on the specific circumstances — so it is important to apply immediately upon receipt of the order.
that: I bought a house and found that part of it was built on land that wasn't mine.. What do we do??
A: This situation is different from a building exception but no less serious — it may be an invasion of someone else's land. A comprehensive examination of the building file, the block and plot diagram, and a verification of ownership at the Land Registry Office are required. Contact a lawyer as soon as possible.
that: Is there a difference between a construction exception for an apartment in a condominium and a private house??
A: Yes. In a condominium, a construction violation may harm not only the specific apartment owner but also other tenants and the integrity of the building. The consent of all tenants of the house is sometimes required, and roof violations may harm the entire building.
12. Summary — What to do now?
12.1 For buyers — 5 steps before every purchase
- Hire a real estate lawyer to perform a comprehensive due diligence — don’t rely on a lawyer who also represents the seller.
- Request the building file from the local committee and compare it to existing permits.
- Hire a structural engineer to inspect the property and issue a written opinion.
- Check with the Taboo Bureau to see if there is a note regarding construction violations, a demolition order, or a transaction prevention order.
- Make sure the contract includes an explicit statement from the seller regarding the condition of the property — with a clear sanction in the event of an abnormality being discovered.
12.2 For sellers — How to protect yourself
Proactive disclosure is the best defense. A seller who discovers existing discrepancies in advance—even if it slightly reduces the sales price—protects themselves from much more expensive future claims. Correcting discrepancies before the sale, when possible, can add significant value to a property.
12.3 For existing property owners
If you know of a construction violation on your property, don't wait for a demolition order. Contact a real estate lawyer and an architect to explore the training options. Proactive action will save you money, nerves, and perhaps even criminal proceedings.